For Roofing Contractors

Price it, get it approved, get it delivered, put it on


TopHat makes retrofit sub-framing for metal-over-metal reroofs and ships it to your jobsite with delivered pricing. Popular sections ship from inventory; others typically in about three weeks.

Quoting

  • What to send for a quote: jobsite ZIP, existing panel profile, roof size, purlin spacing, new panel.
  • Quick estimating rule: sub-framing over every purlin takes about 100 ÷ purlin spacing (ft) lineal feet per square. At 5-foot spacing, about 20 lineal feet per square, plus extra members where the engineering tightens spacing in edge and corner zones.

Choosing the product

JobProduct
Straightforward reroof, spec calls for a notched zeeZee Strip (get a quote to compare with Roof Hugger™)
Reroof plus added load (solar, sprinklers, rooftop units, higher design loads)TopHat Subframe (strengthens purlins)
Tight wind design in edge and corner zonesAdd Deflection Limiters between purlins
Corrugated roof: transite, FRP (fiberglass) or corrugated metalQuik-Clip (the economical overlay for corrugated and low-profile panels)

When the spec names another brand

Most specs allow an equal with pre-bid approval. Our substitution guide covers deadlines and what to submit; TopHat Zee-Strip was approved by addendum on a 2024 State of Iowa bid.

Installing

Engineering

Retrofit framing is engineered for each building's loads. TopHat can provide an engineering and shop drawing package for your project; always have it reviewed by a professional engineer licensed in the project's state.